Month 1: Fundamentals of Steel & Pipe Manufacturing

  • Week 1: Introduction to Steel
    • Types of steel (carbon steel, alloy steel, stainless steel, etc.)
    • Steelmaking processes (BOF, EAF, secondary refining)
    • Mechanical properties (strength, toughness, ductility)
  • Week 2: Pipe Manufacturing Methods
    • Seamless vs. welded pipes
    • Pipe forming processes (ERW, LSAW, SSAW, seamless extrusion)
    • Heat treatment basics (normalizing, quenching, tempering)
  • Week 3: Pipe Classifications & Applications
    • API, ASTM, ASME, and other classification standards
    • Uses in oil & gas, construction, and other industries
    • Differences between casing, tubing, line pipe, and structural pipe
  • Week 4: Pipe Coatings & Protection
    • Anti-corrosion methods (galvanizing, 3LPE, FBE coatings)
    • Internal coatings for flow efficiency
    • Cathodic protection and field joint coatings

Month 2: Pipe Specifications & Standards

  • Week 5: API SPEC 5CT (OCTG) & API SPEC 5L (Line Pipe)
    • Pipe grades, chemical composition, and mechanical properties
    • Differences between J55, K55, N80, L80, P110, etc.
    • H40 vs. X42, X52, X60, X70, and beyond
  • Week 6: ASTM & ASME Standards
    • ASTM A53, A106, A333, A335
    • ASME B31.3 (Process Piping), B31.8 (Gas Transmission)
  • Week 7: Pipe Dimensions & Tolerances
    • Outer diameter (OD), wall thickness (WT), and schedules
    • Pipe end types (beveled, plain, threaded)
  • Week 8: Pipe Mechanical & Chemical Testing
    • Tensile, impact, hardness, and flattening tests
    • Chemical analysis (spectroscopy, PMI testing)

Month 3: Heat Treatment & Metallurgy

  • Week 9: Steel Microstructure & Phases
    • Ferrite, pearlite, bainite, martensite
    • Grain size and its impact on mechanical properties
  • Week 10: Heat Treatment Processes
    • Normalizing, annealing, quenching & tempering (Q&T)
    • Effect of heat treatment on pipe properties
  • Week 11: Pipe Defects & Failure Analysis
    • Common defects (laminations, cracks, inclusions)
    • Root cause analysis of failures (corrosion, fatigue, hydrogen embrittlement)
  • Week 12: Welding & Pipe Joining
    • Types of welding (SMAW, GMAW, GTAW, SAW)
    • Weld quality control and NDT methods

Month 4: Pipe Inspection & Testing

  • Week 13: Non-Destructive Testing (NDT) Methods
    • Ultrasonic Testing (UT), Radiographic Testing (RT)
    • Magnetic Particle Testing (MT), Liquid Penetrant Testing (PT)
  • Week 14: Hydrostatic Testing & Pressure Testing
    • Test pressure calculations
    • Failure criteria and acceptance limits
  • Week 15: Quality Control & Certification
    • Mill Test Reports (MTRs)
    • Third-party inspection and traceability
  • Week 16: Pipe Handling, Storage & Logistics
    • Safe handling practices
    • Storage conditions to prevent corrosion

Month 5: Advanced Applications & Industry Insights

  • Week 17: Pipe Selection for Different Environments
    • High-temperature, high-pressure, sour service applications
  • Week 18: Pipeline Engineering Basics
    • Pipe laying methods (onshore, offshore)
    • Bending, welding, and testing in pipeline construction
  • Week 19: Pipe Coatings & Insulation for Extreme Conditions
    • Deep-sea pipelines, cryogenic applications
  • Week 20: Real-World Case Studies & Problem-Solving
    • Reviewing failures and industry best practices

Month 6: Mastery & Certification Preparation

  • Week 21: ASNT & API Certifications Overview
    • API 570 (Piping Inspector), API 653 (Tank Inspector)
    • ASNT Level 1 & 2 in NDT
  • Week 22: Mock Exams & Practical Applications
    • Hands-on case studies
    • Solving real industry challenges
  • Week 23: Industry Trends & Future Technologies
    • Smart pipes, IoT monitoring, AI-based inspections
  • Week 24: Final Review & Mastery Validation
    • Conduct self-assessment
    • Prepare for professional certification exams

Similar Posts